Category Archives: Uncategorized

Murphy’s Road

Murphy’s Road Project: This Site is situated in Flat Bush in South Auckland. Currently, well over 1.5 kilometers of pipe has been installed, predominately 200mm PVC and 100mm PVC with just under 100 Lot Connections. The team at Construct Civil have out done themselves in these challenging conditions that winter has thrown at us.

Beachlands Stages 1-3

This is a high-quality residential subdivision development involving the civil construction of earthworks, roads, stormwater, sewer drains and services. These projects consisted of the installation of over 3 kilometers of PE Watermain and over 100 lot connections!

Hobsonville Point Developments

Hobsonville Point Developments.

Because of our continued ability to deliver high-quality outcomes and our customer-focused approach, we have been repeatedly retained Dempsey Wood Civil on successive stages of this development and what we have achieved is impressive. We’ve basically built the infrastructure for a whole town. Majority of Watermain size installed here is 315mm and everything below!
In this growing and desired location of Auckland, the boys and Construct Civil Limited have installed 10’s of 1000’s of kilometers of PE watermain in the area and over 1000 lot connections to keep up with demand and growth of housing. No challenge is ever too big for the team!

Halls Farm Stage 1

Halls Farm Stage 1 Project in Orewa is a current labour of love which the Boys at Construct Civil Limited are nearing the completion of. Consisting of over 2 kilometers of 315mm, 250mm, 180mm, 125mm and 63mm PE pipe with over 100 new house connections. Its only going to get busier with the next 3 stages of the project adding a further 300+ lots!

Whenuapai Developments

Construct Civil Limited is undertaking the Utility works for up to 950 lots on a 49ha Greenfields site on the junction of Brigham Creek and Totara Roads in Whenuapai. Works commenced in 2015 and is being undertaken in six stages over a four year period.

A significant part of the contract works is the infrastructure upgrade works to service the Special Housing Area which includes the watermain network.

Therefore, in addition to the installation of over 7.5km of watermain reticulation within the subdivision – Construct Civil has installed approximately 6km of 315Ø Watercare watermain in the road corridor from Whenuapai 1 precinct along Brigham Creek and Trig Roads; and from the Whenuapai 2 Precinct along Brigham Creek Road and Fred Taylor Drive in live traffic conditions. The watermain was installed using open-trench and trench-less methods and Construct Civil also undertook testing, commissioning and connection to the Watercare network.

Airfields Project in Hobsonville

Construct Civil Limited continued the great relationship with Dempsey Wood Civil by installing over 2 kilometers of PE watermain on this project alone and the installation of over 100 new house connections!

The majority of the pipe size of this Project was 250mm PE pipe with a bit of 180mm, 125mm and 63mm PE pipe.